SFRS Service Delivery Review (SDR) Consultation

Closes 16 Sep 2025

Cowcaddens / Govan / Springburn / Yorkhill / Maryhill

Option 1

This option is to consider rebuilding Cowcaddens on the Maitland Street site and maintaining two wholetime appliances. Reinstatement of the second appliance that was temporarily withdrawn in September 2023; AND

The reduction of the number of wholetime appliances based at Govan from two to one. The second appliance was temporarily withdrawn in September 2023; AND

The reduction of the number of wholetime appliances based at Springburn from two to one; AND

The closure of Yorkhill which has one wholetime appliance based there; AND

The reinstatement of the second wholetime appliance at Maryhill that was temporarily withdrawn in September 2023. 

Option 2

This option is to consider the reduction of the number of wholetime appliances based at Govan from two to one. The second appliance was temporarily withdrawn in September 2023; AND

The closure of Cowcaddens which has two wholetime appliances based there. Maintain ownership of the neighbouring Maitland Street site for future development; AND

The reinstatement of the second wholetime appliance at Maryhill that was temporarily removed in September 2023. 

1. Prior to this consultation, how much did you know about these proposed changes?
2. Considering these two options, do you prefer Option 1, Option 2 or neither of these options?
There is a limit of 1000 characters
There is a limit of 1000 characters
3. What local circumstances do you think should be considered alongside these proposed changes?
There is a limit of 1000 characters
There is a limit of 1000 characters
4. Are there any other issues you think SFRS should consider in looking at these options?
There is a limit of 1000 characters
There is a limit of 1000 characters
5. Are there any alternative options you think SFRS should consider in Cowcaddens, Govan, Springburn, Yorkhill and Maryhill?
There is a limit of 1000 characters
There is a limit of 1000 characters