SFRS Service Delivery Review (SDR) Consultation

Closes 16 Sep 2025

Balmossie / Kingsway East

Option 1

This option is to consider the removal of the wholetime appliance at Balmossie and maintain one on call appliance at the station; AND

The reinstatement of the second wholetime appliance at Kingsway East that was temporarily removed in September 2023.

Option 2

This option is to consider the closure of Balmossie which currently has one wholetime appliance and one on call appliance; AND

The reinstatement of the second wholetime appliance at Kingsway East that was temporarily removed in September 2023. 

1. Prior to this consultation, how much did you know about these proposed changes?
2. Considering these two options, do you prefer Option 1, Option 2 or neither of these options?
There is a limit of 1000 characters
There is a limit of 1000 characters
3. What local circumstances do you think should be considered alongside these proposed changes?
There is a limit of 1000 characters
There is a limit of 1000 characters
4. Are there any other issues you think SFRS should consider in looking at these options?
There is a limit of 1000 characters
There is a limit of 1000 characters
5. Are there any alternative options you think SFRS should consider in Balmossie and Kingsway East?
There is a limit of 1000 characters
There is a limit of 1000 characters